| AXEL FERRARI 25-36-1 4H |
Alamo • Williams/Divide, ND |
TD: 06/29/2024 |
3-Mi (25,175' MD) |
6.46 Days |
All-Time Bakken 3-Mile Speed Record (beat Phoenix's prior Daniele 2H record) |
| DANIELE 26-35-2 2H |
Alamo • Williams/Divide, ND |
TD: 05/09/2024 |
3-Mi (25,225' MD) |
6.52 Days |
Tied #2 Fastest 3-Mile Well in Bakken History (prior basin record holder) |
| JACOBSON 19-30-31 3H |
Alamo • Williams/Divide, ND |
TD: 08/22/2024 |
3-Mi (25,513' MD) |
6.52 Days |
Tied #2 Fastest 3-Mile Well in Bakken History (25,513 ft measured depth) |
| AXEL FERRARI 25-36-1 5H |
Alamo • Williams/Divide, ND |
TD: 07/08/2024 |
3-Mi (24,946' MD) |
6.60 Days |
4th Fastest 3-Mile Well in Bakken History (gives Phoenix 4 of top 5 Bakken 3-milers) |
| NYSTUEN 20-17-8-5-1H |
Alamo / Big Stone • ND |
NDIC #41872 |
20,797.5 ft Lateral |
Single-Run 4-Mi |
Longest 4-Mile Lateral in Bakken; 1st operator to drill five 4-mile wells on 1 pad |
| WILLOW GRAY 2-11-14-23-4H |
Big Stone • Divide, ND |
33-023-01639 (#42042) |
~20,000+ ft (4-Mi) |
9.29 Days |
Fastest-Drilled 4-Mile Lateral (09/24/2025); produced 23,621 BBL oil in Aug 2026 |
| WILLOW GRAY 2-11-14-23-2H |
Big Stone • Divide, ND |
33-023-01637 (#42040) |
~20,000+ ft (4-Mi) |
9.71 Days |
2nd Fastest 4-Mile Lateral (09/14/2025); produced 23,508 BBL oil in Aug 2026 |
| WILLOW GRAY 2-11-14-23-5H |
Big Stone • Divide, ND |
33-023-01640 (#42043) |
~20,000+ ft (4-Mi) |
9.77 Days |
3rd Fastest 4-Mile Lateral (10/06/2025); produced 21,646 BBL oil in Aug 2026 |
| NYSTUEN 20-17-8-5-4H |
Alamo / Big Stone • ND |
NDIC #41874 |
~20,000+ ft (4-Mi) |
10.38 Days |
4th Fastest 4-Mile Lateral (07/16/2025); part of landmark 5-well Nystuen pad |
| NYSTUEN 20-17-8-5-5H |
Alamo / Big Stone • ND |
NDIC #41875 |
19,786' Lat (30,926' MD) |
13.35 Days |
97% In-Zone Middle Bakken across 5.86 miles total pipe; vertical drilled <12 hrs |
| WILLOW GRAY 2-11-14-23 1H-LL |
Big Stone • Divide, ND |
33-023-01636 (#42039) |
4-Mile Pad Well |
#1 Aug '26 Well |
25,030 BBL Oil & 25,385 MCF Gas in Aug 2026; 1st 6-well 4-mile pad in basin |
| WILLOW GRAY 2-11-14-23 6H-LL |
Big Stone • Divide, ND |
33-023-01641 (#42044) |
4-Mile Pad Well |
#2 Aug '26 Well |
24,066 BBL Oil & 27,139 MCF Gas in Aug 2026 (Willow Gray pad >140k BBL/mo) |
| GAIL ARNOLD 33-28-21 2H |
Skabo • Divide, ND |
33-023-01632 (#42015) |
3-Mile Lateral |
#3 Aug '26 Well |
23,782 BBL Oil & 22,248 MCF Gas in Aug 2026 (Gail Arnold 1H added 23,012 BBL) |
| DANIEL FERRARI 3-10-15-22 1H |
Alamo • Divide/Williams, ND |
Q2/Q3 2025 |
19,520 ft (3.75-Mi) |
1,153 BOPD IP |
Peak Initial Production of 1,153 BOPD upon Q3 2025 commissioning |
| WILLER PAD (MULTI-WELL) |
Williston Basin • ND |
Q3 2025 |
3.75-Mile Laterals |
$6.3M / Well |
1,100 BOPD Peak IP; lowest cost per well ($1.4M/well under budget; $8.6M total savings) |
| MONTANA 4-MILE SWITCHBACK WELLS (BONSAI / SHOGUN) |
Williston Basin • Montana |
Q2 2026 Milestone |
4-Mile "U-Turn" |
1st in Montana |
First 4-Mile Lateral Switchback Wells Drilled in Montana + 1st Full 8-Well 4-Mile Unit Development in MT |